HELP ARTICLE

How to Add MultiLipi to Your Framer Website: Multilingual SEO & GEO Setup

MultiLipi
MultiLipi3/7/2026
5 Min read
Blog cover image

Framer is an incredible platform for designing lightning-fast, visually stunning websites. But to truly scale your brand, your site needs to be discoverable in multiple languages and optimized for the new era of AI Answer Engines.

By installing the MultiLipi: AI Translate & Rank plugin, you seamlessly bridge the gap between world-class design and enterprise-grade Generative Engine Optimization (GEO) — without writing a single line of code.

Why Integrate MultiLipi with Framer?

Before diving into the setup, here is what this plugin unlocks for your Framer site:

Zero-Code Localization

No need to duplicate pages or wrestle with complex CMS structures. MultiLipi translates your entire Framer site block-by-block dynamically.

Global SEO Dominance

Your translated pages become instantly indexable by Google in their respective regions — Spanish users find you in Spanish, Japanese users in Japanese.

AI Visibility (GEO)

MultiLipi automatically injects optimized JSON-LD Schema and generates llms.txt files directly into your Framer site's infrastructure, making ChatGPT, Perplexity, and Gemini cite your brand.

Prerequisites

Before you begin, ensure you have:

Created a project in your MultiLipi Dashboard.
Copied your MultiLipi Project Key (found in your MultiLipi project settings).

Step-by-Step Installation Guide

Follow these steps to get MultiLipi running on your Framer site in minutes.

01

Open Your Framer Project

Log in to your Framer account and select the specific project workspace where you want to add multilingual capabilities.

Framer dashboard showing all projects — select your target project

Note: Make sure you have editor access to the project. Viewer-only accounts cannot install plugins.

02

Access the Plugins Menu

Inside the Framer editor, click the Main Menu Icon (the Framer logo) at the top-left of your screen. Scroll down and select Plugins from the dropdown list, then choose Browse All.

Framer editor main menu open with Plugins → Browse All highlighted

Note: The Plugins option is located near the bottom of the main dropdown menu.

03

Search & Install MultiLipi

A plugin search popup will appear. Type "MultiLipi" into the search bar, locate the plugin named MultiLipi: AI Translate & Rank, then click on it to launch the setup window.

Framer plugin marketplace search showing MultiLipi: AI Translate & Rank result

Note: If the plugin doesn't appear, ensure your internet connection is stable and try refreshing Framer.

04

Connect Your Project Key

The MultiLipi Setup modal will prompt you to connect your account. Paste your unique Project Key (e.g., a1ee519f…) into the text field, then click the blue Connect to MultiLipi button.

MultiLipi Setup modal with project key input field and Connect to MultiLipi button

Note: Your Project Key is found in your MultiLipi Dashboard under project settings. Keep it private — treat it like a password.

05

Verify the Connection

Once connected, the plugin window updates to show your active configuration. You will see a green dot indicating "Connected to Project," along with your Original Language (e.g., English) and configured Target Languages (e.g., Hindi, French).

MultiLipi plugin showing Connected to Project status with English original and Hindi target language

Note: If you need to add or remove languages, click "Open Dashboard" to manage them in your MultiLipi account.

06

Publish Your Site

MultiLipi is now injected into your site's code! To push these changes live:

Close the plugin window.
Click the blue Publish button in the top-right corner of the Framer editor.
Click Update to finalize the deployment.

Post-Installation & Troubleshooting

Once published, visit your live website. You should now see the MultiLipi language switcher (usually floating in the bottom-left corner by default). Change the language to trigger your first translations!

Not seeing the language switcher?

Check Publishing Status: Ensure Framer has fully finished deploying your latest update. Large sites can take a few minutes to propagate.
Clear Cache: Hard refresh your browser (Ctrl+Shift+R / Cmd+Shift+R) or try opening your site in an Incognito/Private window.
Support: If you are still stuck, our engineering team is here to help. Reach out at support@multilipi.com.

Was this article helpful?

In this article

Share

Ready to Go Global?

Let's discuss how MultiLipi can transform your content strategy and help you reach global audiences with AI-powered multilingual optimization.

Fill out the form and our team will get back to you within 24 hours.